KKP- HIRARC case study report, HIRARC definition report.
RC- double storey structure design report.
Foundation- summary journal report, pile and retaining structure assignment.
Technical writing- a surveying project report.
Building Service- Energy consumption of building project report, building cooling load project report.
PSM- technical paper, PSM1 report.
Engineering software - staad pro project, exteem project, primaverla report, HMS report.
IDP- whole report including sustainable design report, environment and water treatment design report, highway and traffic design report, structure design report, foundation design report,quantity survey report.
每个project几乎都要presentation. 这样算下去都有20 个report. 也就是每个礼拜最少都要弄好一两份才能跟得到脚步。 还没考虑test和quiz的温习时间,还有我做psm的project呢?
看来学校真的把我变超人了。。
Pengaruh Pupuk Organik Terhadap Pertumbuhan Tanaman Padi
-
[image: Pengaruh pupuk organik terhadap pertumbuhan tanaman padi]
Pengaruh pupuk organik terhadap pertumbuhan tanaman padi
Menurut Nyanjang (2003) bahwa pe...
4 个月前